冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤,施工人員應(yīng)踏在底盤的加強(qiáng)筋上,在安裝塔外殼、底盤等纖維件時(shí),為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場合,須安裝在通風(fēng)良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
凹凸国产熟女精品视频国语| 亚洲日韩欧美一区二区三区| 色婷婷影院| 无码av免费精品一区二区三区| 国内精品久久久久久无码不卡| 一本无码久本草在线中文字幕dvd 99久久久国产精品消防器材 | 极品人妻少妇一区二区三区| 99久久国产福利自产拍| 亚洲天堂色图| 91精品网站| 免费亚洲视频| 久久精品成人无码观看| А√天堂BT中文在线| 欧美牲交A欧美牲交aⅴ| 无码网站天天爽免费看视频| 日日噜噜夜夜狠狠视频免费| 日本a v在线播放| 五月天社区| 久久精品熟女亚洲av麻豆网站| 专干老肥熟女视频| 久久亚洲AV成人无码电影| 一本色道久久88加勒比—综| 久久精品中文騷妇女内射| 国产精品永久久久久久久久久| 亚洲欧洲日产国码av系列天堂| 国产在线观看黄av免费| 久久精品99久久香蕉国产| 扒开末成年粉嫩的小缝图片| 国产人妖视频一区二区| 在线观看国产成人av天堂| 久久99热狠狠色精品一区| 亚洲Av无码专区国产乱码京东传媒| 国产精品爽爽V在线观看无码| 亚洲国产欧美一区三区成人 | 久久久精彩视频| 宅宅午夜无码一区二区三区| 99精品视频69v精品视频| 久久久91精品一区二区| 天堂√在线中文最新版8| 男女啪啪永久免费网站| 国产在视频线精品视频|